About 5200 sq ft in total • 5 bedrooms, 4 full baths, ½ bath in main house • 3 bedrooms (or 2 with study), 2 full baths, ½ bath in guest house • Pool with full outside bath outside Outside shower with changing room on one side and a ½ bath on the other side. […]
Height Limits Increase for Ship Bottom Oceanfront Homes
An ordinance introduced by the Ship Bottom Borough Council last week raises the maximum height limit of oceanfront homes from 32 to 35 feet. Mayor William Huelsenbeck said the ordinance represented a “give-and-take” with the beach replenishment project, and noted similar measures are in effect in Harvey Cedars and Long Beach Township. “Some homes have […]
Beach Replenishment Photos in Ship Bottom
Long Beach Island Beach and Dune Contract
CHRISTIE ADMINISTRATION ANNOUNCES START OF $128 MILLION BEACH AND DUNE CONTRACT ON LONG BEACH ISLAND PROJECTS ARE KEY TO STATE’S POST-SANDY COASTAL PROTECTION SYSTEM (15/P41) TRENTON – The Christie Administration today joined with the U.S. Army Corps of Engineers’ Philadelphia District to announce the start of construction on a $128 million contract to complete beach […]
Beach Replenishment Project
The U.S. Army Corps of Engineers’ Philadelphia District awarded a contract on December 5, 2014 to the Great Lakes Dredge and Dock Company for $128 million to complete the initial construction of the Long Beach Island Coastal Storm Damage Reduction project in New Jersey. The work will involve dredging approximately eight million cubic yards of […]